Project aim: Developing a new formalin unit
Major accomplishments:
Establishing the technical installation office, performing executive operations, Testing and implementation of electrical and instrumentation tasks including
Various electrical cabling, control and instrumentation cabling
Various electrical, control systems and instrumentation enclosures
Various instrumentation equipment and calibration
Construction and support installation of various conduits, tray and ladders for cables
Various earthing systems and lightning protection equipment
Various instrumentation tubes and corresponding attachments
Various equipment for lighting system and network
Various types of electromotors with corresponding equipment
Establishing technical execution office, performing executive operations and testing all equipment installation activities, including
All types of manual and automatic valves
Various types of strainers
Establishing technical execution office, performing executive operations and testing all piping equipment, including
Various types of carbon steel, galvanized and stainless steel pipings
Various types of fittings and flanges with gasket and wrench mountings
Non-disruptive testing operations including RT and PT of Weld Joints
Rupture operation, pneumatic test, hydraulic test, line flushing and drying
Acid cleaning of steel welds
Painting and sandblasting
Non-metal piping (polyethylene)
Hot and cold insulation of pipelines, fittings, valves and fixed equipment including tanks and reactors
flexible accordion fittings
Production and installation of various pipe supports
Scaffolding and creating temporary access
Repair and welding of steel ducts and some vending equipment (made in Italy)
Mitter for special fittings and vendors
Steam tracing implementation