Implementation of cement projects

Implementation of cement projects

.

Construction activities in electrical, control, and instrument systems of Cement Projects:

 

Fars Scout Industrial Company has been executed a number of installation, precommissioning and commissioning project including all electrical equipment, control systems and instrumentation in number of cement projects, the most important of which are listed below:

 

_3300 Ton production line of Mond  Dashti Cement

_3300 Ton production line of Lamerd Cement

_3300 Ton production line of Shahre-Kord Cement

_3300 ton production line of Sepahan Cement expansion plan

_2000 Ton production line of Isfahan Cement expansion plan

 

The most important construction activities of these projects were:

 

  • Installation, testing, commissioning, and startup of all 63 KV HV substation equipment and setting the protection relays.

 

  • Installation, testing, commissioning, and startup of all factory transformers.

 

  • Installation, testing, commissioning, and startup of all MV substation 6.3 KV equipment and setting the protection relays.

 

  • Installation, testing, commissioning, and startup of  LV substation 400V equipment and setting the protection Relays.

 

  • Installation the tray and ladder in entire production line, underground tunnels, and substation basements.

 

  • Cabling of whole plant, including Medium Voltage and Low Voltage power cables, control and instrument and optical cable

 

  • Installation, termination, testing, commissioning, and startup of all control system and programming of PLC controllers, and commission of Central Control Room computers.

 

  • Installation, termination, testing, commissioning, and startup of electric motors and their drivers.

 

  • Installation, termination, testing, commissioning, and startup of instrumentation.

 

  • Installation, commissioning and startup of emergency power systems including diesel generators and UPSs.

 

  • Installation and commissioning and startup of electrical and instrument packages such as gas analyzers [O2 and CO], Kiln scanner, Kiln and Cooler cameras, air conditioners, Kiln flare equipment, and grease sprayers.

 

  • Installation, commissioning and startup of all capacitive banks.

 

  • Installation and commissioning of all equipment of lightening arresters, junction boxes and motor local control units.

 

  • Installation and commissioning of all equipment of earthing equipment.

 

  • Cooperating in final commioning of the entire production line with mechanical and process disciplines.

 