Fars Scout Industrial Co. has been nominated for the New Rotary Packer and Truck Loader Project and several civil projects in Margon Cement Factory. The new Rotary packer and Truck Loader machineries are supplied by Haver & Boecker Company. The activities in this Projects are listed below:

Engineering Activities:

  • Rotary Packer building was decided to be placed besides the existing building in such a way that feeding to the new packer to be possible from existing elevators in old building. Also the delivery of the packed cement bags from old and new packers to old and new truck loaders were requested to be possible. Implementing these criteria made the engineering rather complicated.
  • Civil Design of the Rotary Packer Building in 5 level and truck loader building in 3 level close to existing buildings
  • Design of mechanical machineries installation layout and local machineries construction design for the new packer facilities
  • Design of electrical, control and instrumentation installation layout and electrical and control panels design for the new packer facilities
  • Electrical and utility design of new Terminal building.

 Civil works:

  • Civil Construction of the Rotary Packer Building in 5 level and truck loader building in 3 level close to existing buildings.
  • Civil Construction of factory new Terminal Building in 3  floor.
  • Leveling and concreting in new terminal area
  • Leveling and concreting in parking area inside and outside of the factory
  • Leveling and concreting in production line area.

 

 

 

Fars Scout Industrial Co. is now engaged in electrical, control and instrumentation erection, pre-commissioning and commissioning of Tis Chabahar Cement Plant under construction.

General Scope of the Project:

 

Project Title

Electrical, control and instrumentation erection, pre-commissioning and commissioning of Tis Chabahar Cement Plant

Position

180Km to the north of Chabahar city, Sistan and Balouchestan province, Iran

Client

Tis Chabahar Cement Co.

Consultant

Mozon Co.

Contractor

Fars Scout Industrial Co.

Contractor Scope

Electrical, control and instrumentation costruction, pre-commissioning and commissioning and supply of construction equipment and bulk material

Contract No.

142-3-14527

Initial Period of the contract

11 month

Contract effective date

27 Jan. 2020

A large portion of the plant equipment is supplied from China by client and the nominal production of the plant is 3000 Ton per day Portland Cement.

Cement electrical contraction job is a heavy one. Some of the quantities monitoring the volume of the construction job is listed below:

  • Cabling : 495 Km
  • Ladder and Tray installation: 19,767 meter
  • Distribution Transformers 1000KVA to 2500 KVA: 10 Pcs.
  • 6.3 KV medium voltage Panels: 33 cells
  • 400 Vac Low voltage Panels: 101 cells
  • Control System Panels: 24 Cells
  • Local Control, instrumentation and electrical Panels: 151 Cells
  • Instruments: 1517 Pcs.
  • Medium Voltage  Motor up to 4MW: 7 Pcs.
  • Low Voltage  Motor up to 250KW: 494 Pcs.
  • Variable Speed  Motor up to 2.2MW: 37 Pcs.
  • Lighting equipment installation: 3628 Items
  • Steel Structure for installation of scope of job: 30,000 Kg
  • Earth, and lightening equipment: 29,939 item