Khoozestan Steel
he project included purchasing, installation and commissioning of PLC panels and also some related equipment listed below:
1- Supply and installation of DC drive to control the material feed of the elevator proportional to consumption power of the elevator bucket.
2 – Control the direction of DC motor automatically, when the reclaimer reaches to the extreme levels.
3 - Automatic movement of the longitudinal movement of the machine toward and backward.
4 – Supply installation and commissioning and training of the control hardware and software of Reclaimer and its HMI software for monitoring station.
7 - Supply install and commissioning of wireless data transmission for the system which is to control the moving Reckaimer machine without any belt control cable connection.
8 - Supply, installation and commissioning of Belt Control Weigher