Amir Kabir Petrochemical Plant
The design, supply, testing and implementation of the control system of Ethylene Recovery Project for Amir Kabir Petrochemical industry was performed by our company as an order from Sina Control Company. The features of this system are as follows
Siemens control system from S7-300 series as redundant
PID control panel design
Designing alarm panels, the panels for monitoring redundancy and PLC hardware as well as analog input calibration
Supplying intrinsically safe inputs